← All Neighborhoods
HANCOCK
Construction permits, major projects, and restaurant inspections for this area.
Show:
Period:
Loading map...
🏛️
Major Projects
2 projects in selected period
🍽️
Restaurant Inspections
9 inspections in selected period
92
Hyde Park Market
4429 Duval St Austin, 78751-3917
Jan 27Excellent
93
Snarf's Sandwiches
2901 Medical Arts St Austin, 78705-3332
Jan 23Excellent
96
goPuff
2902 Medical Arts St Austin, 78705-3324
Jan 23Excellent
91
Pizza Di Roma
3316 Harmon Ave Austin, 78705-2128
Jan 22Excellent
89
St David's Medical Center Cafe
919 E 32nd St Austin, 78705-2703
Jan 22Fair
87
Delta Tau Delta Fraternity
2801 San Jacinto Blvd Austin, 78705-3815
Jan 15Fair
96
HEB - Retail - Dairy
1000 E 41st St Austin, 78751-4810
Jan 8Excellent
96
HEB - Retail - Dairy
1000 E 41st St Austin, 78751-4810
Jan 8Excellent
96
Tokyo Gardens Catering
1000 E 41st St Austin, 78751-4810
Dec 15Excellent
🏗️
Building Permits
16 permits in selected period
🏗️
2026-018480 BPActive
4114 RED RIVER ST
2026/02/21 | (2026/02/17) | This is a private wedding at the Commodore Perry Estate venue 4100 Red River St Austin 78751. We will be putting up a platform and tent for the event. In the tent there will be dinner served and then a wedding reception. This project consists of the installation of a temporary elevated platform and 50¿ x 120¿ clear-span structure tent within the Sunken Garden at the Commodore Perry Estate for a private wedding event hosting approximately 170 guests. The event will take place on Saturday February 21 from 3:00 PM to 11:00 PM.
Installation will begin Wednesday February 18 at 9:00 AM. Work will commence with construction of the full elevated flooring system. The platform will be constructed using ring-lock scaffolding with screw jacks and base plates supporting 6x6 wood beams and ¿¿ plywood decking with a vinyl overlay finish. Due to existing site slope platform elevation will vary from approximately 12 inches at the northeast corner to approximately 24 inches at the southwest corner.
Heating ducts will be routed beneath the platform and will not penetrate tent walls. Stairs will be installed at both the front and rear of the structure to provide primary and secondary egress. An ADA-accessible ramp will be installed along the left (mansion-facing) side of the platform to accommodate guests and service access.
On Thursday February 19 flooring installation will continue and the structure tent frame and top will be installed. On Friday February 20 final detailing and installation will be completed with 100% turnover to the client by 12:00 PM to allow vendor load-in.
The tent will be anchored using engineered concrete ballast blocks. No permanent foundations or ground penetrations are proposed. The structure is fully temporary and will be removed during a two-day strike on Sunday February 22 and Monday February 23.
Feb 17New
🏗️
2026-018489 BPActive
4114 RED RIVER ST
2026/02/21 | (2026/02/17) | This is a private wedding at the Commodore Perry Estate venue 4100 Red River St Austin 78751. We will be putting up a platform and tent for the event. In the tent there will be dinner served and then a wedding reception. This project consists of the installation of a temporary elevated platform and 50¿ x 120¿ clear-span structure tent within the Sunken Garden at the Commodore Perry Estate for a private wedding event hosting approximately 170 guests. The event will take place on Saturday February 21 from 3:00 PM to 11:00 PM.
Installation will begin Wednesday February 18 at 9:00 AM. Work will commence with construction of the full elevated flooring system. The platform will be constructed using ring-lock scaffolding with screw jacks and base plates supporting 6x6 wood beams and ¿¿ plywood decking with a vinyl overlay finish. Due to existing site slope platform elevation will vary from approximately 12 inches at the northeast corner to approximately 24 inches at the southwest corner.
Heating ducts will be routed beneath the platform and will not penetrate tent walls. Stairs will be installed at both the front and rear of the structure to provide primary and secondary egress. An ADA-accessible ramp will be installed along the left (mansion-facing) side of the platform to accommodate guests and service access.
On Thursday February 19 flooring installation will continue and the structure tent frame and top will be installed. On Friday February 20 final detailing and installation will be completed with 100% turnover to the client by 12:00 PM to allow vendor load-in.
The tent will be anchored using engineered concrete ballast blocks. No permanent foundations or ground penetrations are proposed. The structure is fully temporary and will be removed during a two-day strike on Sunday February 22 and Monday February 23.
Feb 17New
🍸
Bars & Venues
2 licensed establishments
Total Revenue
$17.6M
Avg/Venue/Mo
$104K