CP239293 DER RENOVATIONS; ALUMNI RENOV.
📊Project Metrics
TDLR #EABPRJA9812052Project Closed
Project has been completed and closed
📋Scope of Work
Abate limited floor tile/mosaic and limited lead paint (on at least one existing door frame); demolish interior
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
🔗Related Projects
📄Related City Permits
Building permits found at or near this location
Exterior remodel existing lt. manuf building. Replace EIFS
Construct new driveway approach of 10 FT
Construct new driveway approach of 19 FT
o Enterprise Electrical will furnish and install new specified light fixtures. ¿ Per Sheet E2.01 and E0.03 Luminaire Schedule o Enterprise Electrical will install and program all lighting controls as specified. ¿ Per Sheet E2.01 Lighting Control System Notes and Sequence of Operation. o Enterprise Electrical will furnish and install new controlled duplex and GFCI receptacles as listed. ¿ Per Sheet E1-01 o Enterprise Electrical will install new branch circuitry and home runs for power lighting and all equipment. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install new floor boxes with Data pathway. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install data boxes and conduits. ¿ Per Sheet E1-0 Drawing Notes 5 o Enterprise Electrical will scan and concrete cutting for poke through floor box. ¿ Per Sheet E1-01 o Enterprise Electrical will furnish and install 4 new furniture system wall feeds with connection and termination. ¿ Per Sheet E1-01 Drawing Notes 2 o Enterprise Electrical will furnish and install rough in boxes and conduit for Security Door/Card Readers. ¿ Per Sheet E1-01 Drawing Notes 3 o Enterprise Electrical will furnish and install disconnect of the below mechanical equipment. ¿ WH-A ¿ TP-A ¿ DOAS-1 ¿ CU-1-2 ¿ FCU1-10 ¿ FCU1-11 ¿ FCU1-12 ¿ FCU1-13 ¿ FCU1-14 ¿ FCU1-15 ¿ FCU1-16 ¿ FCU1-17 ¿ FCU1-18 ¿ FCU1-19 ¿ BS-1 ¿ BS-2 ¿ CU-1-20 ¿ FCU-1-20 ¿ CU-1-21 ¿ FCU-1-21 ¿ Per Sheet E03-01 Mechanical/Plumbing Equipment Connection Schedule o Enterprise Electrical will furnish and install the below listed distribution equipment. ¿ Panel H1T ¿ Panel LCLA ¿ 75 KVA Transformer ¿ Per Sheet E4.00 Electrical Riser Diagram o Enterprise Electrical will furnish and install the fire alarm conduits and back boxes. ¿ To be determined once fire alarm drawings are furnished.
Rack service sub-metered Electrical service meter installation for New Construction of Commercial Building in the ETJ. ref 2025 077729 SC