MDACC FM120101 SMITHVILLENETWORK UPGRADE
๐Project Metrics
TDLR #EABPRJB2811763Project Closed
Project has been completed and closed
๐Scope of Work
Build and provide proper conditioning for new equipmentrooms in designated campus buildings. Provide new condui
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$412K total๐๏ธSame Design Firm
$3.0M total๐Related City Permits
Building permits found at or near this location
installing a rooftop residential solar system with battery backup on an existing residence
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 4bath] with Attached Carport. Bldg 2
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 3.5bath]. Bldg 3
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 4bath] with Attached Carport. Bldg 1
ePlan: Residential Expedited Review - New construction of a 2-story single family residence w/ 2-car side-facing carport rear porch 5 bed 4 bath.