CP449384 CAM: C-1 GMP 1 DEMO AND CONSTRU
๐Project Metrics
TDLR #EABPRJB3800777Project Closed
Project has been completed and closed
๐Scope of Work
DEMOLITION (INCLUDING ABATEMENT) TO SUPPORT CONSTRUCTIONOF STAIR 5 IN UT ADMINISTRATION BUILDING (UTA).
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$4.9M total๐Related City Permits
Building permits found at or near this location
Installation of Fireline
This permit is for the onsite water line that is connecting to the building - we need this inspected and passed before we can go on into the ROW which is already approved and permitted. we did not know we would need a separate permit from the building permit PP for this connection on the private side. ref 2025-027183 BP
ePlan: Commercial Expedited Review - Interior Remodel and Change of Use from Business Office to Event Space (5128 SF).
Replacement of complete existing central heat and air system with or without duct work Replacement of complete existing central heat and air system with or without duct work replacing 2 ton AC and indoor air handler with new 2 ton AC and indoor air handler unit 1
Install Level 2 EV Charger