TOWN LAKE PARK-AUDITORIUM SHORES IMPROVE
๐Project Metrics
TDLR #EABPRJB4812586Project Closed
Project has been completed and closed
๐Scope of Work
Retaining walls, concrete walks, concrete steps, slopinglawn.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$2.6M total๐๏ธSame Design Firm
$17.4M total๐Related City Permits
Building permits found at or near this location
interior remodel - Home Remodel -Under house plumbing system replacement -new flooring for the house 1900 sqm -Wall and ceiling repair -replace 35ยฟx47ยฟ window with the same size and same location Kitchen Remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new AFCI outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles Master Bathroom Remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 GFCI outlets -install 2 recessed light -new cabinets countertops and tiles Second Floor Bathroom Remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 GFCI outlets -install 1 recessed light Office Renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -Install 4 new AC supply grills and extend ductwork and connect to the main HVAC System and Airhandler Bathroom Addition -Remove existing wall separating the future bathroom space from the living area to create the new layout -Install a structural wood beam to support the load-bearing requirements of the removed wall. -Frame and install new walls as per plans -install wall tiles cabinets paint walls -Install fixtures as per plans Master Bedroom Remodel -Extend Master Bedroom Closet as per design layout -install 2 new outlets as per code -install 3 recessed LED Lights and wirings Laundry Remodel -remove existing door and create new access door to water heater tank -install new cabinets
Interior finish out.
Interior finish out. [7 Day Review]
Interior finish out (Bldg. 15)
Interior finish out