๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

TOWN LAKE PARK-AUDITORIUM SHORES IMPROVE

800 W RIVERSIDE DRIVE, Austin, TX 78704, Austin, TX, 78704
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB4812586
$2.3M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
7 months
Duration
Registered:Apr 7, 2014
Start:Apr 1, 2014
Target:Nov 1, 2014
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

Retaining walls, concrete walks, concrete steps, slopinglawn.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
April 7, 2014
Construction Start
April 1, 2014
Expected Completion
November 1, 2014

๐Ÿ“„Related City Permits

Building permits found at or near this location

800 CEDAR GLN

interior remodel - Home Remodel -Under house plumbing system replacement -new flooring for the house 1900 sqm -Wall and ceiling repair -replace 35ยฟx47ยฟ window with the same size and same location Kitchen Remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new AFCI outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles Master Bathroom Remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 GFCI outlets -install 2 recessed light -new cabinets countertops and tiles Second Floor Bathroom Remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 GFCI outlets -install 1 recessed light Office Renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -Install 4 new AC supply grills and extend ductwork and connect to the main HVAC System and Airhandler Bathroom Addition -Remove existing wall separating the future bathroom space from the living area to create the new layout -Install a structural wood beam to support the load-bearing requirements of the removed wall. -Frame and install new walls as per plans -install wall tiles cabinets paint walls -Install fixtures as per plans Master Bedroom Remodel -Extend Master Bedroom Closet as per design layout -install 2 new outlets as per code -install 3 recessed LED Lights and wirings Laundry Remodel -remove existing door and create new access door to water heater tank -install new cabinets

ActiveElectrical PermitAddition and RemodelDec 2025
View Details
2025-133059 EP
๐Ÿ”งPinPoint Electrical Systems
8001 CIRCUIT OF THE AMERICAS BLVD UNIT 905

Interior finish out.

ActiveMechanical PermitRemodelDec 2025
View Details
2025-096712 MP
๐Ÿ”งVertex Mechanical LLC
8001 CIRCUIT OF THE AMERICAS BLVD UNIT 702

Interior finish out. [7 Day Review]

ActiveMechanical PermitRemodelDec 2025
View Details
2025-096790 MP
๐Ÿ”งVertex Mechanical LLC
8001 CIRCUIT OF THE AMERICAS BLVD UNIT 1502

Interior finish out (Bldg. 15)

ActivePlumbing PermitRemodelDec 2025
View Details
2025-121220 PP
๐Ÿ”งCHT Services LLC
8001 CIRCUIT OF THE AMERICAS BLVD UNIT 802

Interior finish out

ActivePlumbing PermitRemodelDec 2025
View Details
2025-109725 PP
๐Ÿ”งCHT Services LLC