๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

KIPP NORTH CAMPUS - PHASE 3 HIGH SCHOOL

8004 CAMERON ROAD, Austin, TX 78754, Austin, TX, 78754
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB5820715
$5.2M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
7 months
Duration
Registered:Jul 27, 2015
Start:Jan 1, 2016
Target:Aug 1, 2016
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

Renovation to existing concrete tiltwall building to house 57,000 sqft high school.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
July 27, 2015
Construction Start
January 1, 2016
Expected Completion
August 1, 2016

๐Ÿ“„Related City Permits

Building permits found at or near this location

8004 PONCHO PASS

ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A577 New 2 story SFR with 4 Bedrooms 3.5 Bath and an attached 2 car garage. FOR RECORD SET SEE: 8002 PONCHO PASS 2025-070719 PR (INCLUDES 23 ADDRESSES.)

ActiveMechanical PermitNewOct 2025
View Details
2025-093150 MP
๐Ÿ”งProtex Plumbing and Mechanical
8004 TISDALE DR

Install EV Circuit

FinalElectrical PermitRepairSep 2025
View Details
2025-113820 EP
๐Ÿ”งHorus Partners
8004 GREENSLOPE DR

Interior remodel - The project includes relocating the master bathroom vanity to a new wall with an added sink replacing the corner shower with a larger walk-in shower and updating plumbing with 40 feet of new cast-iron drain line under the slab and driveway. Electrical work involves upgrading all outlets switches and light fixtures throughout the home with improved switch placement in the master bath. A French-style hinged door will replace the existing sliding door in the master bedroom. Flooring in both the master bedroom and bathroom will be replaced. In the kitchen new energy-efficient appliances (dishwasher refrigerator oven/microwave combo) a wall-mounted vent hood and new countertop and sink will be installed.

FinalElectrical PermitAddition and RemodelSep 2025
View Details
2025-107577 EP
๐Ÿ”งMAGPIE ELECTRICAL SERVICES, LLC
8004 GREENSLOPE DR

Interior remodel - The project includes relocating the master bathroom vanity to a new wall with an added sink replacing the corner shower with a larger walk-in shower and updating plumbing with 40 feet of new cast-iron drain line under the slab and driveway. Electrical work involves upgrading all outlets switches and light fixtures throughout the home with improved switch placement in the master bath. A French-style hinged door will replace the existing sliding door in the master bedroom. Flooring in both the master bedroom and bathroom will be replaced. In the kitchen new energy-efficient appliances (dishwasher refrigerator oven/microwave combo) a wall-mounted vent hood and new countertop and sink will be installed.

FinalPlumbing PermitAddition and RemodelAug 2025
View Details
2025-107577 PP
๐Ÿ”งPlumbLife Industries LLC
8004 GREENSLOPE DR

Interior remodel - The project includes relocating the master bathroom vanity to a new wall with an added sink replacing the corner shower with a larger walk-in shower and updating plumbing with 40 feet of new cast-iron drain line under the slab and driveway. Electrical work involves upgrading all outlets switches and light fixtures throughout the home with improved switch placement in the master bath. A French-style hinged door will replace the existing sliding door in the master bedroom. Flooring in both the master bedroom and bathroom will be replaced. In the kitchen new energy-efficient appliances (dishwasher refrigerator oven/microwave combo) a wall-mounted vent hood and new countertop and sink will be installed.

FinalBuilding PermitAddition and RemodelAug 2025
$1
View Details
2025-107577 BP
๐Ÿ”งRC Construction