POND SPRINGS ELEMENTARY SCHOOL HVAC RENO
๐Project Metrics
TDLR #EABPRJB6814529Project Closed
Project has been completed and closed
๐Scope of Work
The vast majority of the scope of work involves replacement of HVAC equipment with like for like replacements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$2.0M total๐Related City Permits
Building permits found at or near this location
AT&T proposes: Install mount modification per plans. Tower Work: Removal of Antennas Radios / RRUs and Air Antennas. Installation of antennas and radios. Ground Work: removal of (12) Diplexers remove existing 48-24V Converters. Recable existing 24V equipment. Convert existing DC power plant to 58V Install: (6) DC Converters (6) DC Breakers (1) 48V Battery Rack and (12) 190AH Batteries.
Replacing inside sewer line and sewer yard line.
Addition of four antennas one OVP junction box and only hybriflex cable to existing telecommunication tower. No change to ground space/compound no change to height of tower.
Install one pylon sign for COTA T11
Replacement of an existing water heater