โœ…Inspection Complete๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

THE GUTHRIE - TRACK ONE

3300 GUTHRIE, Austin, TX 78702, Austin, TX, 78702
Final Inspection85%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB6823363
$1.0M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
2y 3mo
Duration
Registered:Aug 24, 2016
Start:Oct 1, 2016
Target:Dec 30, 2018
โœ…

Inspection Complete

Final inspection completed, awaiting project closure

๐Ÿ“‹Scope of Work

R2 Apartments, 3 and 4-story, Club and Leasing.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
August 24, 2016
Construction Start
October 1, 2016
Expected Completion
December 30, 2018

๐Ÿ“„Related City Permits

Building permits found at or near this location

3300 MOUNT BONNELL DR

Install new gas line for generator

ActivePlumbing PermitRepairDec 2025
View Details
2025-157643 PP
๐Ÿ”งBurls Plumbing
3300 S CONGRESS AVE

Replaced entire gas system with black iron from meter to each of the three gas fixtures Install/Replace Poly 1 to 1 ยฟ x 25 Basic Access Minimal obstructions or basic ladder access. Minimum crawl space clearance exceeds 18. Crawl space distance not to exceed 15 feet from access opening to work site. Maximum step ladder height up to 8 feet. Maximum extension ladder height up to 15 feet with a safe landing area 3300 South Congress Avenue Austin TX 78704 U

FinalPlumbing PermitRepairDec 2025
View Details
2025-158449 PP
๐Ÿ”งRadiant Plumbing & AC
3300 BIG BEND DR

New inground pool spa and concrete decking.

ActivePlumbing PermitNewNov 2025
View Details
2025-147561 PP
๐Ÿ”งNICK KIESLING DBA @ZEN
3300 KERBEY LN

Level 2 EV Charger powered by a 60amp Circuit Breaker. Run #6 THHN c.u. & #10 THHN c.u. ground through <60 feet New 3/4ยฟ EMT conduit approx. to power the Level 2 EV Charger at 48amp constant draw.

ActiveElectrical PermitRepairNov 2025
View Details
2025-143644 EP
๐Ÿ”งFaraday Electric
3300 MERRIE LYNN AVE

New 2-story accessory structure consisting of a half bathroom covered porch and uncovered wood decks on the 1st floor and an office on the 2nd floor accessed by an exterior wood staircase.

ActiveMechanical PermitNewNov 2025
View Details
2025-072711 MP
๐Ÿ”งEpic Mechanical Inc

Quick Actions

TDLR ID: EABPRJB6823363

Property Owner

๐Ÿ‘ค
ARGYLE RESIDENTIAL
4 projects ยท $39.5M
JOHN BURNHAM 1601 S. MOPAC EXSPWY STE 175D, AUSTIN, TX 78746

Design Firm

๐Ÿ›๏ธ
STEINBERG DESIGN COLLABORATIVE LLP
4 projects ยท $3.8M
SANFORD P. STEINBERG 8100 WASHINGTON AVE. STE # 110, HOUSTON, TX 77007