BOWIE HIGH SCHOOL BID PACKAGE 4
๐Project Metrics
TDLR #EABPRJB8802607Project Closed
Project has been completed and closed
๐Scope of Work
Construction of football practice fields. No built structures. Modification to crosswalk at corner of Wolftrap
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$800K total๐Related City Permits
Building permits found at or near this location
New Pool (438sqft) and Spa (53 sqft) with pervious turf (non-compacted base)
New installation of light poles for existing public education
Install new 2 ton 17 Seer multi stage system.
install/replace 200 amp main breaker panel and meter can (underground)
Stand-Alone - CONDUIT ONLY PERMIT Work consists of conduit work for the new sports complex at Bowie High School. Work that is involved: CONDUIT ONLY: For Sports Lighting Scoreboards Time-Clocks Pressboxes Was granted the permission by Interim Director Keith Mars to pull a Stand Alone for CONDUIT ONLY so we are not delayed. The Conditional Site Permit was based off the Site Plan Number: SP-2024-0439CX. All other work outside of Conduit work will be installed and inspected once the building permit is submitted.