ENCLAVE AT ESTANCIA PHASE 5
๐Project Metrics
TDLR #EABPRJB8821157Review Complete
Design review complete, construction may proceed
๐Scope of Work
Construction of water, wastewater, storm sewer, streets,sidewalks, ramps
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
ETJ New Construction of a SFR 1450sqft Meter Installation
Installation of new 4 inch domestic waterline. Installation of 8 inch waterline. Installation of a 2 inch waterline service and installation of new 6 inch wastewater line.
Replace plumbing underneath building 16 after tunnel is dug to expose the plumbing pipes under the building.
Replacement of complete existing central heat and air system with or without duct work change out