TDLR #EABPRJB9801999Project Closed
Project has been completed and closed
๐Scope of Work
Widening and reconstruction of an existing two lane roadway. Addition work includes sidewalk, culverts, bridges,
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$16.4M total๐๏ธSame Design Firm
$14.8M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 1.5 ton vertical heatpump system
The scope of work planned includes: installation and relocation of existing beverage equipment gondolas and food warming equipment. MOdifications to the existing plumbing and electrical systems as needed for the new and relocated equipment.
ePlan: Commercial Expedited Review - Finish out to Expand Data Center into existing Shell Areas. Scope of Work Includes 2 AE Transformers. (10000 SF)
New construction single-family residential 1-story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio.
Replacement of complete existing central heat and air system with or without duct work