Browning Auto Parts
๐Project Metrics
TDLR #TABS2019004467Review Complete
Design review complete, construction may proceed
๐Scope of Work
New Phase 1 Construction of two buildings, Sales / Warehouse and Disassembly and Re-location Phase 2 Construction of Core Storage Building with associated Site Improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$658K total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work HVAC replacement like for like
Emergency Service Customer Has No Power Replaced Full Overhead Service Like for Like
disconnect/reconnect no meter work done *ADD TO: 2024-053224 EP* NEW Tesla Gateway/Powerwall
Install 10 (385W) roof mounted solar panels 3.850 kW solar service system tying into a new 200 AMP rated Tesla Gateway with 2 Tesla Powerwall 3
Replacement of complete existing central heat and air system without duct work