HEB Austin 05 (031)
๐Project Metrics
TDLR #TABS2019009727Project Closed
Project has been completed and closed
๐Scope of Work
addition of an IMP building with a walk in cooler freezer combo.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$450K total๐๏ธSame Design Firm
$700K total๐Related City Permits
Building permits found at or near this location
Installation and replacement of coffin display cases with end caps within the Dairy department and with scheduled floor railings around the perimeter of the case with some MEP modifications
installation and replacement of coffin display cases with cases with end caps plus soup boil station and with scheduled floor railing around the perimeter of the case with some MEP modification
installation and replacement of coffin display cases with cases with end caps plus soup boil station and with scheduled floor railing around the perimeter of the case with some MEP modification
Installation and replacement of coffin display cases with end caps within the Dairy department and with scheduled floor railings around the perimeter of the case with some MEP modifications
installation and replacement of coffin display cases with cases with end caps plus soup boil station and with scheduled floor railing around the perimeter of the case with some MEP modification