ICU RR Particle Lab
๐Project Metrics
TDLR #TABS2020007408Project Closed
Project has been completed and closed
๐Scope of Work
Architectural/ Interior, Mechanical, Electrical, Plumbing, and Limited Structural Engineering design for the addition of a laboratory within an existing warehouse facility.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$7.7M total๐Related City Permits
Building permits found at or near this location
There was a copper theft and damage to service would like to apply for an emergency repair permit and to get the power back on safely for a 200A 3P 208V Y service no new meter can required.
Minimal repairs to electrical service due to vandalism. Make safe only for Austin Energy to re-energize. ***EC will be removing two old existing services and building a new 400a service to include a 60a house meter only and capacity for future meters as needed. Building is vacant. -Hyatt***
Replacement of complete existing central heat and air system with or without duct work
Replacing Existing 7 Eleven Trade Equipment; No Exterior or HVAC System Changes; Store to Remain Open; No Structural Changes
New Solar System Installation for new residential home build.