Travis Co WCID 10 Pump Station 3 Phase 2
๐Project Metrics
TDLR #TABS2020008825Project Closed
Project has been completed and closed
๐Scope of Work
New pump station facility with parking and perimeter sidewalk
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$84.2M total๐Related City Permits
Building permits found at or near this location
Interior remodel and Porch enclosure Remodeling the interior by moving and adding walls to create a bedroom and a half bathroom downstairs and also reconfiguring some of the bedrooms/closets upstairs enclosing an upstairs covered porch which will become part of a bedroom replacing all of the exterior doors and windows footprint of home will not change
**Reference 2025-025534 BP** Provide and install temporary 200-amp single-phase power pole for construction use. Includes meter base main breaker weatherproof receptacles grounding and installation to meet City of Austin and NEC 2023 requirements. Service to be energized after passing inspection by the Authority Having Jurisdiction (AHJ) and Austin Energy connection.
Interior remodel and Porch enclosure Remodeling the interior by moving and adding walls to create a bedroom and a half bathroom downstairs and also reconfiguring some of the bedrooms/closets upstairs enclosing an upstairs covered porch which will become part of a bedroom replacing all of the exterior doors and windows footprint of home will not change
Interior remodel and Porch enclosure Remodeling the interior by moving and adding walls to create a bedroom and a half bathroom downstairs and also reconfiguring some of the bedrooms/closets upstairs enclosing an upstairs covered porch which will become part of a bedroom replacing all of the exterior doors and windows footprint of home will not change
Interior remodel and Porch enclosure Remodeling the interior by moving and adding walls to create a bedroom and a half bathroom downstairs and also reconfiguring some of the bedrooms/closets upstairs enclosing an upstairs covered porch which will become part of a bedroom replacing all of the exterior doors and windows footprint of home will not change