Spectrum News - Austin
๐Project Metrics
TDLR #TABS2020015700Project Closed
Project has been completed and closed
๐Scope of Work
Interior remodel of an existing office and news studio space. The building is a three (3) story building, two (2) levels over open parking garage.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$6.9M total๐Related City Permits
Building permits found at or near this location
cutting underneath the sink next to the stove. We will have to pull out the stove to gain access and we will cut out a section of that board in order to gain access to the vent stack that runs up and also the sink line. We will be redoing that section of cast-iron with all new PVC and will be right back on to the section already redone. The vent that runs up through the roof that has no water traffic. We will re-band the PVC to it and will leave that portion alone.
Hey DUDE - Wall Sign
Total demo of garage 360 sq ft circa 1952 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Excavate 30 tunnel to repair main drain line under house
Foundation Repair