Apron Breakroom
๐Project Metrics
TDLR #TABS2020015809Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
Shell space finish out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$1.3M total๐Related City Permits
Building permits found at or near this location
Secondary Contractor Underground Water/Wastewater & Storm Lines
Installation of Fireline + Riser
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase 1]
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase II]
Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase 1]
๐Related Site Plans
City of Austin site plan approvals at this location