Sahota San Marcos I-35
๐Project Metrics
TDLR #TABS2020022033Project Closed
Project has been completed and closed
๐Scope of Work
dirt work, concrete foundation and paving, structural steel, metal framing, electrical, plumbing, hvac. finish out.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$2.1M total๐Related City Permits
Building permits found at or near this location
replace sewer from house to tap. Also tunnel under house to replace all drain piping for upstairs stack kitchen drain toilet and drain from washer in garage. All piping under house is rusted and rotted and has many separations
Replace exterior light fixtures replace burnt outlet in master bedroom install GFCI outlet at front porch.
LEvel 2 EV charger installation 200 amp meter base replacement 200 amp panel replacement overhead grounding and bonding
Replace approximately 50 of sewer line from house to tap
Install electrical service to provide power for CapMetro bus Stop