System Integration Building
๐Project Metrics
TDLR #TABS2020022926Project Closed
Project has been completed and closed
๐Scope of Work
New construction of a 17,400 GSF metal building on the Pickle Research Campus that includes work bays, meeting room, work room, support spaces, restrooms and storage mezzanine.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Exterior remodel existing lt. manuf building. Replace EIFS
Replace 100amp disconnect and melted wires
Replace 100amp disconnect replace melted wire and melted blocks
Need to replace 1/2 watts 009 for the soda carbonator and 1/2 watts 800 M4QT for the sanitizer at the mop sink the second backflow at the mop sink will be removed as it is no longer in use.
Construct new sidewalk of 1800 LF