Stony Point High School Ag Barn Renovation
๐Project Metrics
TDLR #TABS2021017426Project Closed
Project has been completed and closed
๐Scope of Work
Replace door, pave some interior dirt areas, insulate roof, add and reconfigure electrical and lighting.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$73.6M total๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
EMERGENCY REPAIR OF RISER MAST PLUS GROUNDING
New construction of a 2-Story Duplex [4bed 5bath] with attach Garage (SEE SEPARATE PERMIT). Unit 1 [3bed 4bath]
New construction PART OF 2-Story Duplex work to include Garage with Unit above. Unit 2 [1bed 1bath]
Addition/ remodel of existing 1-story single-family residential to include: rear addition of bedroom study 1 bath utility room mud room covered rear patio and two uncovered wood deck steps. Complete interior remodel of existing structure.
No power on the property. We would like to drop a 350-amp service overhead to our free-standing pedestal. All on this pedestal will be one AE meter which will allow power to flow to one 200-amp panel with a main breaker and one 150-amp panel with a main breaker in ETJ