Lake Travis HS Interior Renovations and Elevator at HS Annex
๐Project Metrics
TDLR #TABS2021021129Review Complete
Design review complete, construction may proceed
๐Scope of Work
Interior renovations, repaved parking lots and drives, new elevator
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$101.4M total๐๏ธSame Design Firm
$6.4M total๐Related City Permits
Building permits found at or near this location
yard sewer spot repair and 10 tunnel below the foundation to repair master bath drain line.1 access - left
Relocate overhead primary to underground.
New 1600-amp service in the ETJ
Replacement of an existing water heater
We are building a temporary service to keep the welding shop powered at Lake Travis high school while Austin Energy Changes the way buildings are feed. Temporary power WO 616147