Liberty Hill ISD | Santa Rita Middle School Expansion
๐Project Metrics
TDLR #TABS2022012689Project Closed
Project has been completed and closed
๐Scope of Work
Santa Rita Middle School expansion for Liberty Hill ISD.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$70.1M total๐๏ธSame Design Firm
$18.4M total๐Related City Permits
Building permits found at or near this location
Replacement of mini-split system St David *This is a separate job not related to anything existing. The mini split is located on the 2nd floor central by AHUs 2&3. It serves the fire control room.
addition and remodel - see attachments
*Partial Demo* Interior remodel of single-story SFR 605 sq ft Addition to rear of existing SFR
New construction single-family residential 2-story 4 bedroom 3.5 bath with attached 3-car garage covered front porch and covered rear patio.
BUILDING SIGN FLAG MOUNTED CABINET DOUBLE SIDED PUSH-THROUGH ACRYLIC LETTERING POLISHED ALUMINUM FACE ON LETTERING EDGE L I T WHITE CABINET TO BE MATTE BLACK 8 THICK POWER SUPPLY STORED WITHIN SIGN 30 SQ FT