Electric Vehicle Charging Stations - South Congress Plaza
📊Project Metrics
TDLR #TABS2022016845Review Complete
Design review complete, construction may proceed
📋Scope of Work
Installation of three electric vehicle charging stations (serving 4 stalls) in an existing retail parking lot including new service rom the utility
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
📅Compliance Timeline
📄Related City Permits
Building permits found at or near this location
Replacement of an existing water heater replace ng water heater
Provide additional power for F2541. Provide and install 2-new 2pole 15a breakers in panel FP47. provide and install a 30a non-fused disconnect. Provide and install 3KVA transformer to feed wiremold along with 3-1 pole 20a breakers and 2 -10-20r receptacles.
Provide temporary power for construction. Temp panel shall be fed from underground pull box located on the west side of the property by the side walk.
New Service for SFR in ETJ
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 ton horizontal gas system