Capstone - Parmer Lane Improvements
๐Project Metrics
TDLR #TABS2022020553Project Closed
Project has been completed and closed
๐Scope of Work
Privately Funded TxDOT ROW Roadway Improvements for Parmer Lane and the Parmer Lane-Dallas Dr. Intersection. Note: TDLR associated items include curb ramps, crosswalk, pedestrian buttons and small sections of sidewalk within the ROW
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$1.8M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater San Felipe Townhomes BUILDING M UNIT 42
Bathroom remodeling only. Remove the tub and shower then turn it into walk in shower in the same footprint. Cap off tub drain and use the shower drain. Replace vanity top and capping off the left side sink.
Bathroom remodeling only. Remove the tub and shower then turn it into walk in shower in the same footprint. Cap off tub drain and use the shower drain. Replace vanity top and capping off the left side sink.
Temp Loop 2021-141879 BP PEC electrical provider