Meanwhile Phase II
๐Project Metrics
TDLR #TABS2022022523Project Closed
Project has been completed and closed
๐Scope of Work
New addition of a per-engineered metal building (PEMB) for 1333 sf storage area, new construction of separate 442 sf structure for restrooms and new construction of a 442 sf per-engineered metal canopy. Total SF 2,217 of new addition and new const.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$4.6M total๐Related City Permits
Building permits found at or near this location
(Davis Rick) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Tunnel under home about 20ft to replace drain line with schedule 40 PVC. Also will repair part of the yard drain line where there is a root intrusion and replace homeowner shut off valve. **main sewer line NO TUNNEL JOB DONE ONLY YARD LINE
Install new gas yard line for a generator.
Replacement of complete existing central heat and air system with or without duct work
Express: We will replace the siding around the chimney from top to bottom with lap siding.