ABIA Existing Terminal Centralized Baggage Handling System Upgrades
๐Project Metrics
TDLR #TABS2023010706Review Complete
Design review complete, construction may proceed
๐Scope of Work
reconfig Checkpoint 2W and 2E, expansion of the checked baggage system. Scope at 2W: screening lane, with equipment, reconfig system and 1 existing room into a private room. Scope 2E: reconfig of storefront system at existing egress.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$22.8M total๐Related City Permits
Building permits found at or near this location
Installation of New Irrigation
Installation of New Irrigation
EMERGENCY REPAIR of OH meter and service for railroad.
Express: Foundation Repair
Construct new driveway approach of 9FT 10.25IN. Driveway approach is from the alley.