Airport Boulevard: Segment C1A from 45th St. to 55th St.
๐Project Metrics
TDLR #TABS2023014536Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
Includes intersection imp., extensive access management implementation, drainage upgrades/mods, water/wastewater relocation, traffic signal upgrades/adjustments, ped. hybrid beacons, median installation, shared use paths, bike lanes & pavement imp.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$45.4M total๐Related City Permits
Building permits found at or near this location
Express: Remove existing shingle roof down to decking and install 24 GA Standing Seam roof system. Roof size is 1407 sqft
Install Level 2 EV Charger
Install irrigation system
Pulling a permit for so the gas company requires a gas test to install a new meter
Construct new driveway approach 16 FT and 17 FT Curb & Gutter. Fee in lieu of sidewalk paid.