Switch AUS NAP05 Building Shell
๐Project Metrics
TDLR #TABS2023017484Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
Office and data center support spaces.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$45.6M total๐๏ธSame Design Firm
$45.1M total๐Related City Permits
Building permits found at or near this location
Create entry tunnel from exterior of home and under foundation to re-plumb/re-route drain system up to bottom of foundation and out to exterior cleanout.
Homebuilders loop for New SFR ref 2025-129505 BP. Austin LTD - Austin Energy
QT - INTERIOR: Replace front door replace patio door replace bedroom door replace laundry bifold doors replace 48sqft of insulation replace 48sqft of sheetrock replace bath vanity replace bath vanity light fixture and bath ceiling light fixture replace laminate kitchen countetop replace 100lf of baseboards EXTERIOR: Replace 192sqft of underlayment replace 472 sqft of siding
QT - INTERIOR: Replace front door replace patio door water heater closet door laundry bi-fold doors replace 394sq ft of insulation replace 394sqft of sheetrock replace 75lf of baseboards unit interior repaint resurface laminate countertops in kitchen replace 5 living room receptacles. EXTERIOR: Replace 240sqft of underlayment and siding.
New Construction Electrical 3488 sq. ft. ETJ