Limestone DG 4629 Priem Lane
๐Project Metrics
TDLR #TABS2023019513Review Complete
Design review complete, construction may proceed
๐Scope of Work
Development of a 5.12-acre tract, including 78,726 sf of light-industrial building, related parking, design of water and wastewater network, a detention pond, and drainage system.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$10.9M total๐Related City Permits
Building permits found at or near this location
Express: Replacing 15 windows (like for like)
installation of a 60A charger with #6 wire and 60A breaker to be installed on a load management device so as to not add a load to the 125A service.
Express: bathroom remodel (remove tub/cap plumbing shower stall replacement)
Express: bathroom remodel (remove tub/cap plumbing shower stall replacement)
Replacement of complete existing central heat and air system with or without duct work