Juniper Ridge Condominium Renovations
๐Project Metrics
TDLR #TABS2023021113Project Closed
Project has been completed and closed
๐Scope of Work
Renovation of existing office building with two levels, lower & upper. Includes 2,471sf of demolition & new construction of lobby, corridors, & restrooms at upper and lower levels.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$2.5M total๐Related City Permits
Building permits found at or near this location
Replaced the sewer main under home and replaced the sewer main. We connected to existing sewer branch arms. Hydro tested the sewer main and branch arms. Owner wont allow to cut open the interior walls to test above the floor.
Disconnect/reconnect to Upgrade main distribution panel.
Install new 5.950 kW rooftop solar system for existing residential only.
Tesla Bidirectional Charger. Tesla gateway 100 feet of SEU 4 AWG 40-100 feet of Conduit 60 amp disconnect 2-3: 1ยฟ LB
Relocate electrical service