๐Ÿ“Review Complete๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

VTX Energy Partners

6011 W. Courtyard Drive, Suite 450, Austin, TX 78730, Austin, TX, 78730
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2024000296
$1.3M
Project Value
11,710
Square Feet
$111/sqft
Cost/SqFt
4 months
Duration
Registered:Sep 6, 2023
Start:Sep 18, 2023
Target:Jan 26, 2024
๐Ÿ“

Review Complete

Design review complete, construction may proceed

๐Ÿ“‹Scope of Work

Renovation/Alternation of interior office lease space on multi-tenant floor.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
September 6, 2023
Construction Start
September 18, 2023
Expected Completion
January 26, 2024

๐Ÿ“„Related City Permits

Building permits found at or near this location

6011 CARY DR

Free standing meter loop for permanent service

ActiveElectrical PermitUpgradeDec 2025
View Details
2025-151480 EP
๐Ÿ”งWilkins Electric Inc.
6011 CARY DR

ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [5bed 3bath] Work to include: enclosing existing breezeway and convert carport to garage with accessory studio above [1bed 1bath].

ActiveBuilding PermitAddition and RemodelNov 2025
$1
View Details
2025-146327 BP
๐Ÿ”งRichcreek Homes
6011 CARY DR

ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res. [5bed 3bath] Work to include: enclosing existing breezeway and convert carport to garage with accessory studio above [1bed 1bath].

ActiveElectrical PermitAddition and RemodelNov 2025
View Details
2025-146327 EP
๐Ÿ”งWilkins Electric Inc.
6011 MOUNTAIN VILLA DR

New irrigation install

ActivePlumbing PermitIrrigationOct 2025
View Details
2025-132708 PP
6011 SALTON DR

Request to disconnect New 200 amp automatic transfer switch installation on the existing 200 amp panel (SPAN panel) no new meter can is required.

WithdrawnElectrical PermitRepairAug 2025
View Details
2025-105752 EP
๐Ÿ”งLonghorn Solar