Valvoline Instant Oil Change
๐Project Metrics
TDLR #TABS2024007591Review Complete
Design review complete, construction may proceed
๐Scope of Work
Improvements include exterior parking lot and drive lane expansion, stormwater detention pond expansion, and parking lot restriping.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐๏ธSame Design Firm
$1.6M total๐Related City Permits
Building permits found at or near this location
Proposal is to correct sewer line underneath the home. This will require us to tunnel under the home about 10ยฟ. We will be accessing the drain system for the laundry and kitchen sink. The camera inspection found holding water and a break on the drain system. The camera didnยฟt appear to go past the fitting after the kitchen sink. We will be replacing this section of cast iron with PVC piping. Once the system is corrected. We will run a hydrostatic test to ensure the system is functioning properly. Once we have completed the test. We will have an inspector come out to view the system. Once a passing inspection is acquired. We will then backfill the tunnel per engineer guidelines. This will complete the job
Detaching electrical meter and breaker box from house while stucco gets repaired and then attaching back
Installing a new irrigation system
Conchos - 2512-I-R- 2 Story single family home with 4 bedrooms 3.5 bathrooms covered porch and patio and attached 2-car garage. Building height 25-5 1/4. FFE: 687.33