PEC Liberty Hill Fuel Island
๐Project Metrics
TDLR #TABS2024014070Project Closed
Project has been completed and closed
๐Scope of Work
The construction of a new fuel island structure including security data service extended electrical service with back up to the existing generator thru the existing warehouse at the existing Oak Hill warehouse yard for Pedernales Electric Cooperative
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$7.6M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater 50gal gas water heater
Verizon will install Antenna Array at 100 on existing 120 monopole telecommunications tower 2 outdoor equipment cabinets on new 4x14 concrete pad and 1 Kohler 30REOZK diesel 203 gallon generator on new 4x8 concrete pad. Battery type: 2 Strings of SAFT TELX+ 180 NiCad batteries.
Verizon will install Antenna Array at 100 on existing 120 monopole telecommunications tower 2 outdoor equipment cabinets on new 4x14 concrete pad and 1 Kohler 30REOZK diesel 203 gallon generator on new 4x8 concrete pad. Battery type: 2 Strings of SAFT TELX+ 180 NiCad batteries.
Proposed 120 monopole tower and ground equipment - no backup batteries or generator proposed
Tunnel up to 15 under slab to repair breaks