Lake Travis High School 2024 Phase 1 Improvements
๐Project Metrics
TDLR #TABS2024022508Review Complete
Design review complete, construction may proceed
๐Scope of Work
New parking lot, modifications to existing parking lot, modified drive aisles, pond modifications (Limits of construction is 465,656sf)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$32.6M total๐Related City Permits
Building permits found at or near this location
temp power for jobsite trailer for the duration of construction Permit and ESPA will need a unique address. 3324 1/2 s fm 620 is already being used by meter 6127109.
Interior remodel to an existing convenience store
Replacement of complete existing central heat and air system with or without duct work
Need to disconnect meter and relevel/concrete service.
install sprinkler system