TCAB (Granger) 1st Floor County Attorney Offices
๐Project Metrics
TDLR #TABS2024025492Review Complete
Design review complete, construction may proceed
๐Scope of Work
Renovation of 7,454 SF of the 1st floor includes select demolition, new metal stud and Gypboard walls, doors and frames, finishes and associated Mechanical and Electrical work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$69.2M total๐Related City Permits
Building permits found at or near this location
Request to disconnect Upgrade overhead service to 325 Amps.
Install new gas line for generator
Scope of Work: Full gas line replacement. Replace the complete poly gas line in ground with a new 1ยฟ poly gas line. The new gas line will be high pressure with regulators at both the pool heater and the fire pit.
Pre-Plumbed Water Softener Install
Replacing existing Cummins 35kW generator with new Generac 60kW whole home generator (Natural Gas) connected to house subpanels. No disconnect required. (Chris Easley)