๐Project Closed๐ง Alteration/Renovation๐ต This project is privately funded, on private land for private use.
Bespoke
1300 E 5th St Suite 375, Austin, TX, 78702
๐Project Overview
$551K
Est. Cost
7,866
Square Feet
5 months
Duration
Complete
Status
๐Scope of Work
Interior finish out of an existing shell office space.
๐ Project Timeline
Registered
December 12, 2024
Closed
December 12, 2024
Construction Start
February 3, 2025
Expected Completion
June 30, 2025
๐บ๏ธLocation
๐Related Projects
๐คMore by CIM Group
๐Related Austin Permits
City permits found at this location
1300 1/2 E 5TH ST
Same locationTemporary Power 21-106027BP
FinalElectrical PermitRepairNov 2021
Details
2021-172775 EP
๐งJMEG, LP
1300 1/2 E 5TH ST
Same locationremodel to existing communication tower. REMOVE 15 ants 24 RRUs 24 Dilexers 3 COVPs 3 Legacy hybrid cables 6 non penetrating sleds. INSTALL 3 non penetrating sleds 9 ants 6 RRUs 3 breakout pendnts 3 HCS 2.0 hybrid cables (1/8) Ground Scope: REMOVE 1 FCOA 1 SSC cab existing plinths 3 COVPs 1 ESMB 5 FSMFs 2 FBBAs 5 FBBCs. RELOCATE 1 FSMF. INSTALL 4 ASIBs 2 ASIKs 4 ABILs 3 ABICs 7 ABIAs 3 AMIAs 3 HCS 2.0 junct boxes 1 HPL3 cabinet 1 SB3 cabinet
FinalBuilding PermitRemodelMar 2021
Details
2020-190601 BP
๐งGlotel Inc
500 Attoyac Street A .00000
Same locationGas Test Whse
FinalPlumbing PermitRemodelDec 1993
1301-1/2 E 5TH ST
135 ft awayTemp Meter loop for construction trailer
FinalElectrical PermitRemodelDec 2012
Details
2012-121401 EP
๐งHallam Electric LLC
Property Owner
๐ค
CIM Group
Contact: Andrew Bartine
2 total projects
1300 E 5th St, Austin, Texas 78702
(323) 946-6526
Design Firm
๐๏ธ
Sixthriver Architects
6 total projects
1601 South Mopac Expressway Suite 100-D, Austin, Texas 78746
(512) 306-9928
Registered Specialist
๐
STACEY L,BREWER
RAS #384
3571 FAR WEST BLVD NO 232, AUSTIN, TX 78731
(512) 632-1632