Travis ECHS Modernization
๐Project Overview
๐Scope of Work
Conttruct a new 389k SF school building with multiple stories; new athletic fields, accessory site structures, site circulation and landscaping; demolition of existing school building
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐คMore by Austin ISD
๐Related Austin Permits
City permits found at this location
express - vehicle crash. damage occurred in interior breakfast room area upstairs bedroom WIC and restroom above exterior crash wall. damage exterior to framing siding windows will be replacing sheetrock insulation siding window
express - vehicle crash. damage occurred in interior breakfast room area upstairs bedroom WIC and restroom above exterior crash wall. damage exterior to framing siding windows will be replacing sheetrock insulation siding window
Replacement of complete existing central heat and air system with or without duct work
Install irrigation system to new residence.
Construct new sections of sidewalk to meet existing sidewalk. Construct new joint access driveway approach. See attached variance and plan correction.**nmt New 2-story duplex - (1) with 3 bedrooms and 2.5 baths (1) with 3 bedrooms and 3 baths; (1) carport and (1) garage.
New 2-story duplex - (1) with 3 bedrooms and 2.5 baths (1) with 3 bedrooms and 3 baths; (1) carport and (1) garage.