GOL: ADA Access to 1.103 & 1.108, CP683934
๐Project Overview
๐Scope of Work
Installation of Ascension ADA elevator lift to make 1.103&1.108 accessible from 1.101 in Goldsmith Hall. This will require modification of railing, installation of a platform extension, and lift installation.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐Related Austin Permits
City permits found at this location
Install Electrical service to provide power for CapMetro Bus Stop
Express: Tub to shower conversion; replace insulation and window in bathroom
ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 1 New construction of a 2-Story Single Family Res. [3bed 3.5bath] with Attached Garage
ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 3 New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Garage
ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 2 New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Garage
ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 2 New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Garage