Austin Peace Academy Expansion & Renovation
๐Project Overview
๐Scope of Work
An approximate 9,507 SF expansion of an existing school with renovations set for a later phase.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐Related Austin Permits
City permits found at this location
Gas pressure test The gas pressure test for 5110 Manor Road is a requirement of the city every two years. This is according to our contact at the property. Needs to have a gas pressure test done to verify no leaks are present. It is on the middle Building and the meter is in the back.
Replace Low Hazard backflow preventer installed by others with High Hazard backflow preventer label or paint any visible Auxiliary Water components provide for thermal expansion conduct cross connection test. This is an existing occupied education facility and is a HEALTH AND SAFETY HAZARD to the public water system and needs immediate attention please.
Emergency - Home occupied Customer has damage to the riser Austin Energy has disconnected customers power and is requesting to repair the riser and change out the meter socket.
Express: Foundation Repair- installing 12 exterior pilings
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work