Volente Crossing Bldg 2 TI
๐Project Overview
๐Scope of Work
Tenant Improvement in shell building.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐คMore by AMNW Office, LP
๐๏ธMore by The Montgomery Design Consultancy, LLC
๐Related Austin Permits
City permits found at this location
Install Traffic signal service upgrade
Upgrade existing underground electrical service and update sub-panel with New breakers
Emergency Job*install/replace 150 amp main breaker panel and meter (overhead) ***Emergency inspection done on 5/4/25. ESPA required-Hyatt***
New work scope- Construct new sidewalk of 1048 LF and curb & gutter of 336.4 Original Work Scope TCP break down according to work scope. Sheets can not be set together if conflicts with each other Sheet 5- Construct new sidewalk of 200 LF and curb and cutter of 100 LF Sheet 6- Construct new sidewalk of 748 LF and curb and cutter of 236 LF Sheet 7- Construct new sidewalk of 100LF *** ROW contractor has been changed to Wurzel Builders Ltd. from Restoration Nation Inc. Revision Work scope- paid for 9 weeks when permit was issued TCP break down according to work scope. Sheets can not be set together if conflicts with each other Sheet 5 (4 Weeks)- 50Lf of Sidewalk left and 0 curb- 1 week remaining Sheet 6(4 Weeks)- 50 FT of sidewalk left and 9 curb- 1 week remaining Sheet 7(4 Weeks)- 100 LF sidewalk-1 weeks remaining.
Not Pre-Plumbed Water Softener Install
Home builders loop Ref: 2024-160054 BP