Josephine Restaurant
๐Project Overview
๐Scope of Work
Tenant finish out project to revitalize an existing structure. Improvements are mostly interior. Existing wooden decks are being rebuilt and expanded. Parking and driveway are not changing.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐๏ธMore by Bercy Fadel + Partners
๐Related Austin Permits
City permits found at this location
There will be 3 guest check-in terminals powered by 6 receptacles (2 outlets per station) spread out over 2 20-amp circuits that currently feed the existing check-in area. The additional load is minimal as the existing computers will be relocated to the new stations and the two circuits currently have an average load of 3-5 amps with everything running.
plumber will install a gas line to pool heater for an existing pool for hotel.
install a gas line to pool heater for an existing pool for homeowner.
New Irrigation Installation
New Construction of Pool Pavilion
New Construction of Pool Pavilion