ADI Austin
๐Project Overview
๐Scope of Work
Interior renovation of existing core and shell build out.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐Related Austin Permits
City permits found at this location
ePlan: Commercial Expedited Review - Interior Remodel to Existing Office Space (125941 SF).
We are trying ro get this permit active for temporary power pole so the general contractor can start working on demolition but we need the existing permanent power to be cut there is an active demo permit 2025-134848 BP can you please help with this thanks
Total Demo of SFR 4474 sqft circa 1957
Replacement of complete existing central heat and air system with or without duct work
18kW whole home generator (Natural Gas) connected to house meter and main panel. Austin Energy disconnect required. (Ramona Nye)
Installation of 61.92 kW Tesla Solar Roof (8) Tesla Powerwall 3 Batteries 1707000-xx-y and (12) Tesla Powerwall 3 Expansion Packs 1807000-xx-y