UT GDC: Office Renovations
๐Project Overview
๐Scope of Work
Project comprises the renovation of an existing lab space on level 1. New work will create a new storage room and computer lab within the existing research lab area.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐Related Austin Permits
City permits found at this location
Thomas Word will be installing 2- SolArk 15K 8 modules -Renon Batteries in garage with two Austin Energy meters and two 200- amp disconnects. the install will also have 29 REC solar panels 430 watt - REC430AA Pure2.
ATT proposes to install on tower 1 mount modification per plans 3 new wireless antennas 3 new radio/antennas 3 new radio units. Ground scope of work: Installing 1 48V DC power plant 11 48V DC rectifiers (6) 50A DC breakers. No change of tower height nor ground disturbance.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
To shut off the power to the main CT can & repair/replace the broken conduit at Bldg 8. This is on Austin Energy side of the meter.