DSISD Rooster Springs Elementary School Secure Vestibule
๐Project Overview
๐Scope of Work
Secure vestibule renovation at 5,077 square feet.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐คMore by Dripping Springs ISD
๐๏ธMore by Pfluger Architects
๐Related Austin Permits
City permits found at this location
Disconnect and Reconnect (PEC) - Installation of a 200A Service Rated Automatic Transfer Switch 26kW whole home generator additional grounding and type 2 surge protection.
Villa 38-86556 - Install new _8.0__kW rooftop solar system to existing residential only using line side tap ONLY.
24kW whole home generator (Natural Gas) connected to house meter and main panel. Austin Energy disconnect required. (Greg Mason)
pool - 13x20 pool with spa autofill and NG Heater
Building Electric service for construction trailers [not for public use] in the Easton Park Southern Compound. 10010-1/2 FM 1625 RD Units 1 2 3 4 ref C8I-2025-0256
Building Electric service for construction trailers[not for public use] in the Easton Park Southern Compound for construction only not for sales. 10012-1/2 FM 1625 RD Units 1 2 3 4 bluebonnet