Playground resurfacing project
๐Project Overview
๐Scope of Work
Resurfacing of an existing playground from artificial turf to poured in place rubber - 26,000SF
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐คMore by Eanes Independent School District
๐๏ธMore by LJA Engineering
๐Related Austin Permits
City permits found at this location
***Timed In-Person Inspection: 06/16/2025 @ 10 AM*** Replacement of complete existing central heat and air system with or without duct work Master bedroom located through upstairs scuttle hole.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 ton horizontal gas system
Renovation of 1600 sq ft of an Existing Medical Office Building to Support Equipment Change out. Select Demo of Non-load bearing. Replacement of Roof Insulating & Membrane. M.E.P.S. Modifications for Suite 100
Renovation of 1600 sq ft of an Existing Medical Office Building to Support Equipment Change out. Select Demo of Non-load bearing. Replacement of Roof Insulating & Membrane. M.E.P.S. Modifications for Suite 100
Renovation of 1600 sq ft of an Existing Medical Office Building to Support Equipment Change out. Select Demo of Non-load bearing. Replacement of Roof Insulating & Membrane. M.E.P.S. Modifications for Suite 100
Renovation of 1600 sq ft of an Existing Medical Office Building to Support Equipment Change out. Select Demo of Non-load bearing. Replacement of Roof Insulating & Membrane. M.E.P.S. Modifications for Suite 100