Rosewood Neighborhood Park Playground Improvements
๐Project Overview
๐Scope of Work
Renovation to existing playground, addition of seating, and small pavilion. Total limits of construction is 3000 sq ft.
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐คMore by City of Austin Parks and Recreation Department
๐Related Austin Permits
City permits found at this location
Tunnel up to 10 under the foundation to repair break on the main PVC drain line. This is broken at an wye fitting connecting the shower & lavatories to the main line and these will also need to be replaced. There will also be a new PVC clean out installed on the sewer line when it exits the house.
Construct new driveway approach of 25 FT and curb & gutter of 40 FT.
New pool
Replace Asphalt shingles with GAF Timberline HDZ shingles
Exterior repairs on the East elevation due to water intrusion including stucco lap siding and stone veneer removal and replacement associated flashings WRB framing repair as required and roofing work.
replace Tankless water heater