Interior Alterations for Central Texas Regional Mobility Authority - Traffic Information Center
๐Project Overview
๐Scope of Work
Interior alteration to first floor suite 100 ( 4937 sf) within and existing 2-story building. Work includes demo and construction of partitions, doors, finishes, ceiling\, lighting, power, data, HVAC and fire protection utilizing existing systems
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐คMore by Central Texas Regional Mobility Authority
๐Related Austin Permits
City permits found at this location
Install new gas line for generator
24kW whole home generator (Natural Gas) connected to house meter and main panel. Austin Energy disconnect required. (Brian Stanford)
Replacement of complete existing central heat and air system with or without duct work
Interior remodel (bath remodels kitchen remodel new floors drywall repair paint etc). converting covered patio to sunroom and building an exterior deck.
Sign A1 - Face-lit channel letters
Sign A2 - Face-lit channel letters