📋Project Registered🔧 Alteration/Renovation💵 This project is privately funded, on private land for private use.

2nd Street Kingdom Hall

2810 E 2nd St, Austin, TX, 78702

📊Project Overview

$165K
Est. Cost
3,194
Square Feet
3 months
Duration
300
Days Left

📋Scope of Work

Interior remodel including finishes and upgrading mechanical systems and parking lot repair.

📅Project Timeline

Registered
October 30, 2025
Construction Start
July 7, 2026
Expected Completion
September 26, 2026

🗺️Location

📄Related Austin Permits

City permits found at this location

2800 E 2ND ST
Same location

Upgrade electrical service to existing commercial bldg only. (Structure Occupied)

FinalElectrical PermitUpgradeNov 2011
Details
2011-099573 EP
🔧Triangle Electrical Contractors
2800-A E 2nd St
Same location

Reconnecting Elec Srv To Exst. Comm Bldg. Warehouse(Only To Be Used For Warehouse Space Only)

VOIDElectrical PermitRemodelDec 2001
$1K
Details
2001-018998 EP
2804 E 2ND ST
Same location

Interior remodel. Partial Demolition. Fire damage reapir. Repairing sheetrock of back bedroom wall and outside bathroom wall. Need to fix walls electric wiring of house.

FinalElectrical PermitRemodelJul 2015
Details
2015-074221 EP
🔧GMG Electrical Services
2804 E 2ND ST
Same location

Interior remodel. Partial Demolition. Fire damage reapir. Repairing sheetrock of back bedroom wall and outside bathroom wall. Need to fix walls electric wiring of house.

FinalBuilding PermitRemodelJun 2015
Details
2015-074221 BP
🔧Juan and Adela Vasquez
2716 E 2ND ST
127 ft away

Install new sewer yard line from house connection to city tap.

FinalPlumbing PermitRepairAug 2021
Details
2021-117147 PP
🔧Talos Plumbing LLC dba Neighborhood Plumbing and Drain
2716 E 2ND ST
127 ft away

Replace bad conductors only to exsting resid

FinalElectrical PermitRepairOct 2011
Details
2011-092376 EP
🔧Now Energy LLC

Property Owner

Registered Specialist

📋
ISAAC,OCHOA
RAS #1234
6149 PIPERS WALK, BROWNSVILLE, TX 78526
(956) 459-1451

Official Record

View on TDLR
ID: TABS2026004713