FIREFLY ETL EXPANSION
📊Project Overview
📋Scope of Work
Interior build-out for the expansion of the ETL within the existing ETL area, including demolition of partitions, doors, and floor pits, and renovation of plumbing, mechanical, and electrical systems as required.
📅Project Timeline
🗺️Location
📄Related Austin Permits
City permits found at this location
Replacement of complete existing central heat and air system with or without duct work
40 tunnel below the foundation to repair sewer main servicing left side of home (Master and hall bath).2 access holes - front back
ELECTRICAL CIRCUITS FOR A GREEN HOUSE BEING BUILT
Replacement of complete existing central heat and air system with or without duct work Ward Walker - Replacement 2T vertical like-for-like gas system
New in ground pool (336sqft) w/ autofill and concrete decking (666 sqft)
New in ground pool (336sqft) w/ autofill and concrete decking (666 sqft)