AMAT B31-B34 Atrium Refresh
๐Project Overview
๐Scope of Work
Renovation of existing Breakroom Areas
๐ Project Timeline
๐บ๏ธLocation
๐Related Projects
๐Related Austin Permits
City permits found at this location
tree knocked down power lines going to a permanent overhead service pole service pole also got knocked down. repair service pole upgrade meter socket to todays AE approval meter socket ground service
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 ton horizontal gas system
install sprinkler system
*Green Building* New construction single-family residential 2-story 4 bedroom 3.5 bath with attached 3-car garage covered front porch and covered rear patio.
Irrigation install
Revision to 2024-103484 PR to add Phase 5. Remodel to Lobby changing finishes refurbish millwork and wall finishes at concession stand self serve ticket kiosk and signage. VERIFY NO MECHANICAL WORK BEING PERFORMED.